Materials and labor lumped into one number
When a client sees a single total, they can't tell how much is material versus work, and the price becomes something they feel entitled to negotiate as a whole.
Build job estimates with clearly split material and labor line items, accurate measurements, and the agreed deposit locked in before the crew shows up.
Free to start. No card required for your first estimate.
When a client sees a single total, they can't tell how much is material versus work, and the price becomes something they feel entitled to negotiate as a whole.
Without written square footage or linear footage quoted, any gap between what was measured and what got built turns into a dispute.
A mid-project change gets agreed on verbally at the job site, and by the end nobody remembers what was added to the original estimate or at what price.
Quote each category — demo, materials, installation — as its own line, with the measurement or unit that fits it.
Define the deposit amount or percentage right inside the quote, so the client approves it alongside the rest of the scope.
When a change comes up mid-job, generate an additional quote linked to the project, without losing the originally signed document.
Real example
A remodeling contractor quotes a 65 sq ft bathroom remodel with demo, materials, and labor as separate line items, plus a 40% deposit before starting. The client opens the link, reviews the quoted measurements, and signs to lock in the job date.
Every line item carries its own amount, so pricing conversations focus on specifics instead of the total number as a whole.
The deposit amount and percentage are documented alongside the scope, instead of relying on a verbal agreement at the job site.
Mid-project changes get quoted and signed separately, and stay linked to the original estimate so the full history is on record.
Yes. Every line item is independent, so you can break out materials, labor, and any other category with its own amount and unit.
Add the quantity and unit (sq ft, linear ft, units) directly on the line item, so it's clear exactly what was quoted.
Include the deposit as a line item or an explicit note on the estimate, with the amount or percentage the client needs to approve before work starts.
Create a change-order quote linked to the original project, with the new line items and their cost, without modifying the already-signed estimate.
Yes. The client gets a public link, reviews the line items from any device, and signs electronically without printing anything.
For contractors & remodelers
Quote by line item, lock in the deposit, and log every change order with simple e-signature.
Create my first estimate